Tera Lamp - Lime Plaster



Based in Los Angeles, United States
The Tera Lamp - Lime Plaster is made of a wheel thrown ceramic shade and ceramic base. Once the ceramic pieces go through the kiln, the lime plaster finish is hand applied in two coats, sanded smooth and finished with a wax sealer.
This product is made to order. Production Lead Time: Approximately 8 - 10 Weeks. Lead time subject to change.
[tab]Dimensions[/tab]Mini: 5" Base dia x 9" Shade dia x 11" OAH
Medium: 5" Base dia x 10.5" Shade dia x 14" OAH
Large: 5.5" Base dia x 12" Shade dia x 17.5" OAH
XL: 6" Base dia x 13.5" Shade dia x 21" OAH
*Dimensions may vary slightly
*Available in addition glazes: Emerald Green, Navy, and Ochre
[tab]Material[/tab]Ceramic shade and ceramic base, brass hardware, and LED lamps.
[tab]Origin[/tab]Los Angeles, CA
[tab]Product Notes[/tab]Brass knob switch hidden in back
180 degree swivel on the shade
8' long cream fabric cord
(3x) G8 LED, 2.5w, 2700k on a dimmer
[tab]Shipping Notes[/tab]Production Lead Time: Approximately 8 - 10 Weeks. Lead time subject to change.
Final checkout is handled by Lawson-Fenning in USD.
Finish
Siena
Based in Los Angeles, United States
About the studio
Los Angeles design brand and marketplace curating vintage-modern furniture, lighting, and home goods with a California sensibility.



Selected
Tera Lamp - Lime Plaster
Mini / Siena
Lead time: Production Lead Time: Approximately 8 - 10 Weeks. Lead time subject to change. [tab]Dimensions[/tab]Mini: 5" Base dia x 9" Shade dia x 11" OAH Medium: 5" Base dia x 10.5" Shade dia x 14" OAH Large: 5.5" Base dia x 12" Shade dia x 17.5" OAH XL: 6" Base dia x 13.5" Shade dia x 21" OAH *Dimensions may vary slightly *Available in addition glazes: Emerald Green, Navy, and Ochre [tab]Material[/tab]Ceramic shade and ceramic base, brass hardware, and LED lamps. [tab]Origin[/tab]Los Angeles, CA [tab]Product Notes[/tab]Brass knob switch hidden in back180 degree swivel on the shade8' long cream fabric cord(3x) G8 LED, 2.5w, 2700k on a dimmer [tab]Shipping Notes[/tab]Production Lead Time: Approximately 8 - 10 Weeks. Lead time subject to change.
Finish
Siena
Final checkout is handled by Lawson-Fenning in USD.